COMPILESQUAD — FIRST AUTOMATION PROJECT SCOPE WORKSHEET Version: 26 September 2026 Source: https://www.compilesquad.com/choosing-first-automation-project Publisher: CompileSquad Technologies Private Limited Use one copy for one task. Complete it locally in your own text editor. Do not include passwords, private customer data or confidential documents. This is a planning aid, not a savings estimate or implementation guarantee. PROJECT AND OWNER Task in one sentence: Business / team: Process owner and reviewer role: Date and document owner: 1. INPUT AND TRIGGER One source (inbox, form or document collection): Event that starts the work: Input format and minimum required fields: Representative redacted samples available: 2. OUTPUT AND DESTINATION Exact output fields: Where the reviewer sees the output: What the reviewer does next: 3. RULES AND EXCEPTIONS Allowed categories / approved reply guidance: Missing-data rule: Ambiguous or mixed-request rule: Cases that must stop for a person: What happens when processing fails: 4. HUMAN REVIEW AND BOUNDARIES Who approves the result: Who performs any external/customer-facing action: Actions the automation must NEVER take: Escalation owner: 5. DATA AND ACCESS Permission to use the input and samples confirmed by: Personal/confidential data that can be removed: Connector and licence availability to validate: Access, storage and retention requirements to agree: Unresolved requirements (do not assume these are approved): 6. BASELINE AND TEST Baseline dates and item count: Measured average handling time per item (including rework): Current errors / exceptions / response time: Which values above are estimates rather than measurements: Test samples: routine, missing, ambiguous and invalid/adversarial inputs: Pass/fail criteria agreed BEFORE testing: Who checks the test results: Review time, ongoing maintenance and tool costs to include: 7. PRIORITY SCORE Use consistent 1–5 ratings across candidates. Volume V (1 infrequent; 5 frequent): Actual items per week: Rule clarity C (1 ambiguous; 5 documented): Effort E (1 low; 5 substantial integration/process change): Risk R (1 recoverable internal error; 5 serious potential harm): Score = V + C + (6 - E) + (6 - R) = ____ / 20 Example ratings: 4 + 4 + (6 - 2) + (6 - 2) = 16 / 20. Ratings are relative judgements, not ROI or a reason to override serious risk. 8. STOP / GO Unresolved data permission, inaccessible systems or no reviewer = pause. Limited-test decision and owner: Stop condition: Manual fallback and person who owns it: Review date: ILLUSTRATIVE SUPPORT-INTAKE EXAMPLE Fictional sample only — not customer work, a live integration or measured results. Input: redacted request ID and message, “Please send a copy of my invoice.” Process: suggest “billing enquiry”; create an internal summary and a draft acknowledgement using approved wording; flag missing/ambiguous information. Output: request ID, suggested category, draft, missing-information note, and assigned reviewer role in a review queue. Review: a person checks identity-verification needs, category and wording, then handles the request in the existing support system. Never: automatically send a reply, look up invoices, refund or change accounts. Validate connector availability, permissions and data handling before building. Test routine, mixed, empty and instruction-overriding messages; record category errors, missing-information flags, draft edits and full handling time. Want to discuss a candidate? Share only a short, non-sensitive summary through: https://www.compilesquad.com/contact Remote services worldwide; US and UK small businesses are current priorities.